Dynamic Experts believes in providing our clients with top-notch ROI. A smoother, well-defined executed and transparent process at each level of the project execution is what we expertly provide to our clients. Nothing is a stumbling block at meeting top-notch quality services, customer goals and expectations are never sacrificed on the altar of cost.

  • Since our inception in 2005, we pride our-self with an in-house research team that develops a precise knowledge base for the development team.
  • We continuously add value to our project management processes by continuously training and equipping our management team with more and advanced skills. These equip them with the best industry practices that they seamlessly implement in projects.
  • Projects are analyzed and reviewed by our experts with keen insight and defining a workflow to handle any deviation or budget constraints
  • Fast responses and turnarounds for all customer requirements is done by a system we have designed and developed, the Dynamic Experts Issues and management System.

 

Analyzing client requirements Accurately

A stands for being accurate. Keen attention is paid to minute details and requirements provided by our clients. This stands as sure assurance that we deliver on client expectations. Below is are key descriptions that we uphold while understanding client requirements.

  • Using cases and functionality for each module.
  • Business requirements and vision.
  • Product requirements for our clients.
  • Each client’s vision and imagination is highly valued at each stage of project execution.

 

Unified Project Management

We embrace the diversity and uniqueness of the special point of contact of every client. We at Dynamic Experts are thoroughly equipped and ready to deal with all these issues and as such, our Dynamic Experts team is well versed with project management and more skilled understanding. We pride our-self with competent project managers who analyze and consult each client professionally and at individual level for the best solution to their needs. Some key responsibilities of each manager include: project planning, Resource planning, Team management, Risk mitigation and giving an updated feedback of project execution on a daily basis.

Development Phase

When analysis of the requirements of each project, breakdown of work structure is complete and plan action is defined. Then development for web development or mobile application development commences. Work is divided into modules based on work breakdown confirmed by our clients. This phase comprises of several steps as discussed below.

  • Data variables, Coding methodologies, and entities are defined in this phase.
  • Backend and Frontend portion are coded simultaneously for each project.
  • Data operation for backend is done manually, by use of predefined data that is identified specifically for testing purposes.
  • Once coding for all modules is complete, system integrators work on them finalizing the final application, and proceed to QA and testing.

 

Monitoring Scope Revisions and Change Requests

Controlling the scope of work for medium size projects in the dynamic field of IT is challenging if not impossible. Thus, we monitor on periodic basis using our predefined processes and documentation at each request we receive from our clients. In order to maintain transparency with our clients and partners, every project manager has to create a change request authorization document and approve it from client. The document contains precise and detailed information about change in scope and whether it will be accommodated with or without addition cost.

Quality Standards and Monitoring.

Dynamic Experts has a team that is dedicated to quality assessment, the quality department is known as Tester zone. These departments is independent from all other department, its crucial at improving resource allocation that affect project costs.

 

Putting Application Live and Deployment.

Working with the environment of a server where an application is going to be hosted, thus from when we commence working on a project we get prerequisites correct according to the updated information of the server. In our possession are various servers configured according to the best industry practice by major host providers.
We prioritize configuring of applications on the serves and put them on live mode. But before putting applications on live mode we do a final check basing on pre-set checklist developed by project managers. Performance and stability checks are done for the application once it’s live, and any issue on the QA process is followed to after the resolution of the issue

System Training for Clients.

The dynamic nature of IT industry is no new news to us, it requires constant learning and knowledge. The current trend is flexible Agile and has methodologies that suit businesses perfectly. We understand and know that clients seek consultative approaches from vendors and solution to their needs. That is why we initiate an increase in training and sharing knowledge with clients for their daily operational needs.
Training involves group work, Agile myths breaking sessions, keen examination of all roles, concepts and documents used in scrum, risks and issues.

web design company in sialkot pakistan